Swimming Pool Construction Process

Custom Pool & Spa Design Pool Contractor

POOL CONSTRUCTION PROCESS & POLICY EXPLANATION

This detail has been put together to help you have an experience during a commonly frustrating process known as POOL installation and construction that is not as daunting as it seems at times once we explain the process.

We have discovered over the years that the #1 cause of frustration is CLIENTS not knowing what to expect. We hope that this guide will give you a better understanding of the swimming pool construction process.

Your entire yard is about to be a complete mess for the next 12 to 24 weeks (This starts the day construction starts not when proposal is signed Greencare has no control over you HOA or city permitting delays) depending on the scope of your project and unforeseen obstacles and delays a pool could take longer than 24 weeks but is unlikely. This packet will really help answer your questions and address your concerns. Please read in in its entirety and refer back to it throughout the process.

PROFESSIONAL POOL CONSTRUCTION STAGES

First step is sending your design off to be structurally engineered. At this point slight changes are needed to ensure the pool and options are structurally sound.

The next stage is obtaining all building permits. This takes time sometimes spending an entire day at a government permitting facility only to be told they have changed a variance or code in your area so we need to adjust the engineered plan to meet there new requirement or a soils report may be needed.

All scheduled dates are tentative and subject to change due to:

-    Each phase is always approved to have been completed properly by the construction office before scheduling next phase which takes time. It is the only way to ensure things are done right.

-    Adverse weather conditions, such as wind or rain, can delay steel, shotcrete, deck and plaster. If this occurs, we reschedule for the next available date. This means if it is windy or rainy for 2 weeks and then it clears up on your installation date. The crews will be busy completing the all other jobs that were delayed during that 2 week period first then once those jobs are done yours will follow.

-    Revisions or changes of any kind along the way to the final approved plan will cause delays.

-    There may be days (or rarely even a week or more) when no work is performed on site. At times if a specialist is needed it takes a week or more to get them on site. Material delays can and often cause an extended delay also (this is why we need all final selections to be made as soon as possible). A specialist may arrive and spend only an hour or two then leave. This is due to the specialized nature of Greencare’s guys and crews then scheduling them in and out. Sometimes the one little thing that required the specialist doesn’t take long but holds up the process.

Building a pool is a great investment that will reap rewards for a lifetime. A vacation, a movie, or a visit to a theme park will all come to an end, but a pool will be enjoyed by your friends and family for years to come.



Tim Hanlon, Pool Contractor